Ongoing Works |
S.N. |
Description of work |
Work awarding Authority |
Work Order value(lac) |
Progress of work (in %) |
Expected date of completion |
1 |
Construction of Single Storied Academic Building with 4-Storied foundation in/c. Sanitary, Water supply and Electrification works at Pirgacha Hazi Saferuddin B.L Alim Madrasah, Pirgacha, Rangpur. |
Executive Engineer, EED, Rangpur, District. |
76 |
5% |
30.09.22 |
2 |
Installation of Deep Tube well (100X38) mm with Submersible Pump at Singair Upazila in manikganj District under Safe Water Supply Through Out the Country Project of Department of Public Health Engneering. |
Executive Engineer,DPHE, Manikgonj. |
178.97 |
5% |
30.09.22 |
3 |
Construction of Bridge (Steel Metal & RCC Slab) at 3rd & 4th Floor between two Building and Installation of Tensile Canopy at 4th Floor Roof (at 5th floor level) |
Project Director, Construction of Administrative Convention Center at Khulna |
110.6 |
5% |
20.12.21 |
4 |
Construction of 10 nos Two storied RCC WASH Block for MT & Boys and FT & Girls at Birgonj Upazila or any Upazila in Dinajpur District including all associated construction, sanitary, plumbing & electrical works. |
Executive Engineer, DPHE, Dinajpur |
148.1 |
5% |
3/11/2022 |
5 |
Extension of New Ansar Barrack at BSC Yard |
Executive Engineer, JETTY, CPA |
1,481.84 |
25% |
18-10-2022 |
6 |
Construction of 10 (Ten) storied 'B'-Type Building No.5 consisting of 72 units for accommodation of CPA staff at North Residential Area. |
Executive Engineer, Construction, CPA |
2,698.17 |
10% |
5/10/2023 |
7 |
Installation of 6 no. Shallow Tube well (96 Nos) at Thakurgaon Sador at Thakurgaon under Project for Safe Water Supply Through Out the Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021. |
Executive Engineer, DPHE, Thakurgaon |
21.64 |
10% |
30-12-21 |
8 |
Installation of 6 no. Shallow Tube well (100 Nos) at Ranisankoil at Thakurgaon under Project for Safe Water Supply Through Out the Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021 |
Executive Engineer, DPHE, Thakurgaon |
22.57 |
10% |
2/3/2023 |
9 |
Installation of 6 no. Shallow Tube well (152 Nos) at Pirgoanj at Thakurgaon under Project For Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021 |
Executive Engineer, DPHE, Thakurgaon |
34.36 |
10% |
10/2/2022 |
10 |
Installation of 6 no. Shallow Tube well (70 Nos) at Thakurgaon Sador at Thakurgaon under Project For Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021. |
Executive Engineer, DPHE, Thakurgaon |
15.81 |
20% |
17-10-21 |
11 |
Installation of 6 no. Shallow Tube well (100 Nos) at Thakurgaon Sador at Thakurgaon under Project For Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021. |
Executive Engineer, DPHE, Thakurgaon |
22.58 |
10% |
17-10-21 |
12 |
Installation of Shallow 234 Tara Tube Well (Extractable) with #6 Hand Pump at Nawabgonj Upazila in Dinajpur District under Safe Water Supply Through Out The Country Project of DPHE during the FY:2020-2021 |
Executive Engineer, DPHE, Dinajpur |
111.78 |
20% |
22-09-21 |
13 |
Installation of Shallow Tara 182 Tube Well (Extractable) with #6 Hand Pump at Birampur Upazila in Dinajpur District under Safe Water Supply Through Out The Country Project of DPHE during the FY:2020-2021 |
Executive Engineer, DPHE, Dinajpur |
86.93 |
20% |
23-09-21 |
14 |
Repair & Renovation Works to M. Mohiuddin Bhuiyan High School Under Nawabganj Upazila Dhaka District. |
EED, Dhaka District |
10 |
95% |
30/08/2021 |
15 |
Installation of 6 no. Shallow 280 Tube well at Different Upzilla at Thakurgaon under PRWSP of Department of Public Health Engineering |
Executive Engineer, DPHE, hakurgaon |
62.26 |
15% |
27-11-21 |
16 |
Installation of 6 no. Shallow 200 Tube well at Different Upzilla at Thakurgaon under PRWSP of Department of Public Health Engineering |
Executive Engineer, DPHE, Thakurgaon |
44.65 |
15% |
30-09-21 |
17 |
Construction of two storied RCC Wash Block Having Four Storied Foundation for MT& Boys and FT & Girls including all associated construction, sanitary,plumbing and electrical works. |
Executive Engineer, DPHE, Thakurgaon |
73.86 |
15% |
23-8-21 |
18 |
Construction of two storied RCC Wash Block Having Four Storied Foundation for MT& Boys and FT & Girls including all associated construction, sanitary, plumbing and electrical works |
Executive Engineer, DPHE, Thakurgaon |
77.51 |
10% |
18-10-21 |
19 |
Installation of 6 no. Shallow 296 Tube well at Ranishankail at Thakurgaon under Project for Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engineering |
Executive Engineer, DPHE, Thakurgaon |
46.25 |
80% |
18-8-21 |
20 |
Construction of Mangrove Cultural Center (Super Structure above Grade Beam, Electrical and Sanitary) SHEIKH RUSSEL ECO PARK. |
The Deputy Commissioner, Khulna |
259.86 |
20% |
24-12-21 |
21 |
Construction of Four Storied Academic Building with Four Storied Foundation including Sanitary and Water Supply and Electrification Works at Bari Bathan Adarsha Dakhil Madrasha under Sadar Upazila of Jhenaidah District. |
Executive Engineer, EED, Jhenaidah |
293.45 |
40% |
23-2-22 |
22 |
Repair and maintenance of different roads footpath surface drain & cross drain and different structure under Engineering division zone-7, ward-48 from work of financial year of 2019-2020. |
Executive Engineer, DNCC, Zone-01 |
24.69 |
95% |
21-08-21 |
23 |
Construction of 4-Storied Academic Building With 4- Storied Foundation in/c. Sanitary, Water Supply & Electrification Works at Bhimpur High School, Boalmari Upazila, Faridpur District |
Executive Engineer, EED, Faridpur Zone |
273.9 |
80% |
1/9/2021 |
24 |
Horizontal (1-classroom, Toilet block & stair) & Vertical Extension of Existing Academic Building in/c Sanitary water supply & electrification works at Kamalapur High School Under Sadar Upazila Faridpur District |
Executive Engineer, EED, Faridpur Zone |
101.09 |
95% |
30-8-21 |
25 |
Horizontal 1 Class Room (Toilet block) & Vertical Extension of Existing Academic Building (1st floor & 2nd floor) in/c Sanitary Water supply & electrification works at Alla Newaj Khairu High School Under Sadar Upazila Rajbari District. |
Executive Engineer, EED, Rajbari Zone |
117.79 |
95% |
10/9/2021 |
26 |
Construction of 4-Storied Academic Building With 4- Storied Foundation in/c. Sanitary Water Supply & Electrification Works at Shaltha Model High School Under Shaltha Upazila Faridpur District |
Executive Engineer, EED, Faridpur Zone |
273.91 |
90% |
23-9-21 |
27 |
Construction of 4-Storied Academic Building With 4- Storied Foundation in/c. Sanitary Water Supply & Electrification Works at Kagdi Muratia Alhaz M. A. Mozid High School Under Shaltha Upazila Faridpur District |
Executive Engineer, EED, Faridpur Zone |
273.91 |
80% |
23-9-21 |
28 |
Construction of Ansar Barrak, Health Office, Mosque, Canteen and Car Shed in TM Compound Area |
Executive Engineer, C.P.A, Chittagang |
731.94 |
95% |
25-8-21 |
29 |
Construction of 4-Storied Academic Building with 4-Storied foundation in/c. sanitary water supply & Electrification works to Begunbari High School at Savar Upazilla Dhaka District. |
Executive Engineer, EED, Savar Zone |
273.91 |
95% |
19-09-21 |
30 |
Construction of single storied Academic Building with 4-storied foundation including sanitary water supply & Electrical works at Hemnagar Girls High School Gopalpur Upazilla District Tangail. |
EED, Tangail Zone |
238.86 |
90% |
28-10-21 |
|
Total = |
|
|
|
|