S.N. Description of work Work awarding Authority  Work Order value(lac)  Progress of work (in %)  Expected date of completion
1 Construction of Single Storied Academic Building with 4-Storied foundation in/c. Sanitary, Water supply and Electrification works at Pirgacha Hazi Saferuddin B.L Alim Madrasah, Pirgacha, Rangpur. Executive Engineer, EED, Rangpur, District. 76 5% 30.09.22
2 Installation of Deep Tube well (100X38) mm with Submersible Pump at Singair Upazila in manikganj District under Safe Water Supply Through Out the Country Project of Department of Public Health Engneering. Executive Engineer,DPHE, Manikgonj. 178.97 5% 30.09.22
3 Construction of Bridge (Steel Metal & RCC Slab) at 3rd & 4th Floor between two Building and Installation of Tensile Canopy at 4th Floor Roof (at 5th floor level) Project Director, Construction of Administrative Convention Center at Khulna  110.6 5% 20.12.21
4 Construction of 10 nos Two storied RCC WASH Block for MT & Boys and FT & Girls at Birgonj Upazila or any Upazila in Dinajpur District including all associated construction, sanitary, plumbing & electrical works.  Executive Engineer, DPHE, Dinajpur 148.1 5% 3/11/2022
5 Extension of New Ansar Barrack at BSC Yard  Executive Engineer, JETTY, CPA 1,481.84 25% 18-10-2022
6 Construction of 10 (Ten) storied 'B'-Type Building No.5 consisting of 72 units for accommodation of CPA staff at North Residential Area. Executive Engineer, Construction, CPA 2,698.17 10% 5/10/2023
7 Installation of 6 no. Shallow Tube well (96 Nos) at Thakurgaon Sador at Thakurgaon under Project for Safe Water Supply Through Out the Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021. Executive Engineer, DPHE, Thakurgaon 21.64 10% 30-12-21
8 Installation of 6 no. Shallow Tube well (100 Nos) at Ranisankoil at Thakurgaon under Project for Safe Water Supply Through Out the Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021 Executive Engineer, DPHE, Thakurgaon 22.57 10% 2/3/2023
9 Installation of 6 no. Shallow Tube well (152 Nos) at Pirgoanj at Thakurgaon under Project For Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021 Executive Engineer, DPHE, Thakurgaon 34.36 10% 10/2/2022
10 Installation of 6 no. Shallow Tube well (70 Nos) at Thakurgaon Sador at Thakurgaon under Project For Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021. Executive Engineer, DPHE, Thakurgaon 15.81 20% 17-10-21
11 Installation of 6 no. Shallow Tube well (100 Nos) at Thakurgaon Sador at Thakurgaon under Project For Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engneering Fy 2020-2021. Executive Engineer, DPHE, Thakurgaon 22.58 10% 17-10-21
12 Installation of Shallow 234 Tara Tube Well (Extractable) with #6 Hand Pump at Nawabgonj Upazila in Dinajpur District under Safe Water Supply Through Out The Country Project of DPHE during the FY:2020-2021 Executive Engineer, DPHE, Dinajpur 111.78 20% 22-09-21
13 Installation of Shallow Tara 182 Tube Well (Extractable) with #6 Hand Pump at Birampur Upazila in Dinajpur District under Safe Water Supply Through Out The Country Project of DPHE during the FY:2020-2021 Executive Engineer, DPHE, Dinajpur 86.93 20% 23-09-21
14 Repair & Renovation Works to M. Mohiuddin Bhuiyan High School Under Nawabganj Upazila Dhaka District. EED, Dhaka District 10 95% 30/08/2021
15 Installation of 6 no. Shallow 280 Tube well at Different Upzilla at Thakurgaon under PRWSP of Department of Public Health Engineering Executive Engineer, DPHE, hakurgaon 62.26 15% 27-11-21
16 Installation of 6 no. Shallow 200 Tube well at Different Upzilla at Thakurgaon under PRWSP of Department of Public Health Engineering Executive Engineer, DPHE, Thakurgaon 44.65 15% 30-09-21
17 Construction of two storied RCC Wash Block Having Four Storied Foundation for MT& Boys and FT & Girls including all associated construction, sanitary,plumbing and electrical works. Executive Engineer, DPHE, Thakurgaon 73.86 15% 23-8-21
18 Construction of two storied RCC Wash Block Having Four Storied Foundation for MT& Boys and FT & Girls including all associated construction, sanitary, plumbing and electrical works Executive Engineer, DPHE, Thakurgaon 77.51 10% 18-10-21
19 Installation of 6 no. Shallow 296 Tube well at Ranishankail at Thakurgaon under Project for Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engineering Executive Engineer, DPHE, Thakurgaon 46.25 80% 18-8-21
20 Construction of Mangrove Cultural Center (Super Structure above Grade Beam, Electrical and Sanitary) SHEIKH RUSSEL ECO PARK. The Deputy Commissioner, Khulna 259.86 20% 24-12-21
21 Construction of Four Storied Academic Building with Four Storied Foundation including Sanitary and Water Supply and Electrification Works at Bari Bathan Adarsha Dakhil Madrasha under Sadar Upazila of Jhenaidah District. Executive Engineer, EED, Jhenaidah 293.45 40% 23-2-22
22 Repair and maintenance of different roads footpath surface drain & cross drain and different structure under Engineering division zone-7, ward-48 from work of financial year of 2019-2020. Executive Engineer, DNCC, Zone-01 24.69 95% 21-08-21
23 Construction of 4-Storied Academic Building With 4- Storied Foundation in/c. Sanitary, Water Supply & Electrification Works at Bhimpur High School, Boalmari Upazila, Faridpur District Executive Engineer, EED, Faridpur Zone 273.9 80% 1/9/2021
24 Horizontal (1-classroom, Toilet block & stair) & Vertical Extension of Existing Academic Building in/c Sanitary water supply & electrification works at Kamalapur High School Under Sadar Upazila Faridpur District Executive Engineer, EED, Faridpur Zone 101.09 95% 30-8-21
25 Horizontal 1 Class Room (Toilet block) & Vertical Extension of Existing Academic Building (1st floor & 2nd floor) in/c Sanitary Water supply & electrification works at Alla Newaj Khairu High School Under Sadar Upazila Rajbari District. Executive Engineer, EED, Rajbari Zone 117.79 95% 10/9/2021
26 Construction of 4-Storied Academic Building With 4- Storied Foundation in/c. Sanitary Water Supply & Electrification Works at Shaltha Model High School Under Shaltha Upazila Faridpur District Executive Engineer, EED, Faridpur Zone 273.91 90% 23-9-21
27 Construction of 4-Storied Academic Building With 4- Storied Foundation in/c. Sanitary Water Supply & Electrification Works at Kagdi Muratia Alhaz M. A. Mozid High School Under Shaltha Upazila Faridpur District Executive Engineer, EED, Faridpur Zone 273.91 80% 23-9-21
28 Construction of Ansar Barrak, Health Office, Mosque, Canteen and Car Shed in TM Compound Area Executive Engineer, C.P.A, Chittagang 731.94 95% 25-8-21
29 Construction of 4-Storied Academic Building with 4-Storied foundation in/c. sanitary water supply & Electrification works to Begunbari High School at Savar Upazilla Dhaka District. Executive Engineer, EED, Savar Zone 273.91 95% 19-09-21
30 Construction of single storied Academic Building with 4-storied foundation including sanitary water supply & Electrical works at Hemnagar Girls High School Gopalpur Upazilla District Tangail. EED, Tangail Zone 238.86 90% 28-10-21
Total =

Completion Work

Completion Work
SL. No. Description of work Work awarding Authority  Work Order value  Source of fund Completion certificate Obtained/ Not obtained
In the year-2021
1 Repair and maintenance of different roads footpath surface drain & cross drain and different structure under Engineering division zone-7, ward-48 from work of financial year of 2019-2020. Executive Engineer, DNCC, Zone-01 2469363.5 Own Obtained
2 Construction of Main Gate at RHD Circle office Compound and Repair of RHD Circle & Division Office Building under Road Division, Jashore, during the year 2020-2021 Executive Engineer, RHD, Jashore 1,926,389.60 Own Obtained
3 Construction of Boundary Wall, RCC Drain and RCC Retaining Wall around Container Yard No- 5 near Khal No- 7 . C.P.A, Chittagang 47,465,328.98 Own Obtained
4 Construction of academic building with 4-storied foundation in/c. sanitary water supply & electrification works to Kalatia Degree College at Keranigonj Upazilla Dhaka District. EED, Savar Zone 7,125,000.00 Own Obtained
5 Installation of 6 no. Shallow 433 Tube Well at Ranishankoil upazilla Thakurgaon under Preferential Rural Water Supply Project of Department of Public Health Engineering. FY-2018-19 DPHE, Thakurgaon 8,995,367.16 Own Obtained
6 Installation of Shallow Tara Tube Well ( Extractable) with #6 Hand Pump at Bochagonj Upazila in Dinajpur District under Safe Water Supply Through Out The Country Project Of DPHE during the FY: 2019-2020 Executive Engineer, DPHE, Dinajpur 7,438,178.12 Own Obtained
7 Installation of 6 no. Shallow Tube Well & Shallow Tara Tube Well ( Extractable) with #6 Hand Pump at Birgonj Upazila in Dinajpur District under Safe Water Supply Through Out The Country Project Of DPHE during the FY: 2019-2020 Executive Engineer, DPHE, Dinajpur 9,281,612.59 Own Obtained
8 Installation of 6 no. Shallow Tube well at Thakurgaon Sadar at Thakurgaon under Project for Safe Water Supply Through Out The Country (PSWSC) of Department of Public Health Engineering Executive Engineer, DPHE, Thakurgaon 7,241,162.87 Own Obtained
  Sub Total =   91,942,402.83    
In the year-2020
1 Construction of 4 nos. RCC WASH BLOCK (MT+Boys and FT+Girls) including 2 nos. inspection pit, 1 no Soad well & 1 no septic tank with all sanitary & electrical works etc. at different upazilla Thakurgaon under NBIDNNGPS. FY-2018-19 Executive Engineer, DPHE, Thakurgaon 5,238,676.02 Own Obtained
2 Improvement works of road & drainage Of Daruslam Mosque to Holding no 16/B-5,1 & 4 Via Darusalam wasa Cannel to under ward no 10 of Dhaka North City Corporation Executive Engineer, Zone-04. 10,897,542.09 Own Obtained
3 Repair and maintenance works of different damaged road, drain, cross drain, pit of ward no 38 Executive Engineer, DNCC, Zone-05 2,467,448.29 Own Obtained
4 R.C.C Pile foundation works to Nawabgonj Pilot High School at Nawabgonj Upazilla Dhaka District. Executive Engineer, EED, Savar Zone 3,438,988.60 Own Obtained
5 R.C.C Pile foundation works to Kobi Nazrul High School at Nawabgonj Upazilla Dhaka District. EED, Savar Zone 2,517,500.00 Own Obtained
  Sub Total =   24,560,155.00    
In the year-2019
1 Construction of Mangrove Cultural Center up-to Plinth level (Foundation, Grade beam etc.) under Sheikh Rasel Eco Park Khulna The Deputy Commissioner, Khulna 8,776,938.60 Own Obtained
2 Construction of R. C.C Road and R.C.C Drain  at ward no 06 Savar Pourashava and similar other works Meyor, Savar Pourasava, Dhaka 2,852,451.00 Own Obtained
3 Construction of c.c road ch.0m-252m from anandapur saint pitter school youfda house via noy konna house at ward no 09 under savar pourashava and other  similar works Meyor, Savar Pourasava, Dhaka 3,339,183.50 Own Obtained
4 Improvement of Road and Construction of RCC Pipe Drain Executive Engineer, DNCC, Zone-01 5,723,718.65 Own Obtained
5 Improvement of Road No. 68/A Gulshan under ward 19 Executive Engineer, DNCC, Zone-03 12,093,250.26 Own Obtained
6 Installation of 6 no. Shallow 434 Tube Well at Ranishankoil Upazila Thakurgaon under Preferential Rural Water Supply Project of Department of Public Health Engineering. FY-2018-19 Executive Engineer, DPHE, Thakurgaon  90,13,407.48  Own Obtained
7 At SSAE/Works/SYT/Section- Face lifting and petty repairing works of residential hotel at 1st floor and 2nd floor of Sylhet station terminal building.  Executive Engineer, Bangladesh RailWay 932,256.67 Own Obtained
  Sub Total =   33,717,798.68    
In the year-2018
1 Construction of Brick Drain with slab (Partly) Starting from Satter Mollah Market to Millon Bapary bari (Holding no B-14/8), Ali Akbor house & Moylar more (Ch. 0+00-0+312.00m). In ward no- 09 and another similar work  at Savar Pourashava, Savar, Dhaka Meyor, Savar Pourasava, Dhaka 2,369,125.00 Own Obtained
2 Construction of BFS road from savar Nama bazar Md. Masod ali house jamsing (ch-0m-90m) to Alamgir Hossen house at ward no 01 and other 5 nos similar works under Savar Pourashava, Savar, Dhaka Meyor, Savar Pourasava, Dhaka 3,686,568.00 Own Obtained
3 Repair with Carpeting and Seal Coat work Executive Engineer,          RHD, Jessore Road Division 498,156.53 Own Obtained
4 Repair with Carpeting and Seal Coat work Executive Engineer,          RHD, Jessore Road Division 499,695.24 Own Obtained
  Sub Total =   7,053,544.77    
In the year-2017
1 Dismantling & Repair of Bailey Bridge at (1) 17th(P) km, 22nd(P)km, 28th(P)km & 47th(p) km of Bhola (Porantalukderhat)-Borhanuddin-Lalmohon-Charfassion-Charmanika Regional Highways (R-890), (2) 9th(p)km o Tazumuddin-Kunjerhat (Fakirhat-Khaserhat Link) Road (Z-8943) & (3) 10th(p) Km of Borhanuddin (Udaypur)-Tazumuddin-Monpura-Shikderhat Road (Z-8905) under Road Division Bhola during the FY 2016-17 Executive Engineer,          RHD, Bhola Road Division 724,895.00 Own Obtained
  Sub Total   724,895.00    
In the year-2016
  Frame work contract for traffic infrastructure development repairer and maintenance at different road of Dhaka North City Corporation Executive Engineer        (Traffic Engineering Circle), DNCC 4,552,498.00 Own Obtained
  Sub Total =   4,552,498.00    
  Grand Total =   162,551,294.27    

Pipe Line Work

Pipe Line Work
SL. No. Description of work Work awarding Authority  Work Order value  Source of fund Present Status
1 Vertical extension of Ladies hostel: Construction of 8th to 9th floor over existing 7th floor at Rangpur Medical College, Rangpur (Civil, sanitary and internal electrification works)  Executive Engineer Rangpur PWD Division 44,563,131.17 GOB On Process
2 Construction of Community Based Water Supply Scheme by installing 100 mm dia tubewell with 1.5 hp Submersible Pump at Sadar Upazila in Dinajpur District under PSWSC project during the FY: 2021-2022 Executive Engineer, DPHE, Dinajpur 6,451,825.20 GOB On Process
3 Installation of Shallow Tara Tube well (75X38) mm Extractable with 6 Hand Pump & Shallow Tube well 100X38mm with Submersible Pumpat with RO Harirampur Upazila in manikganj District under Safe Water Supply Through Out the Country Project of Department of Public Health Engneering. Executive Engineer,DPHE, Manikgonj 10,847,250.00 GOB On Process
Total Work value 61,862,206.37